![]()

Proportionell riktad ventil olja pump hpp-vd3v-l40a5-a
The components must pass the inspection, the material code meets the drawing requirements, the surface is cleaned, and the mating surface is coated with engine oil. The bearing box should be cleaned and coated with oil resistant enamel, and naturally dried for 24 hours. After passing the inspection, it can be assembled. 2. Assembly of bearing and shaft: The bearing is heated to 90 degree - 110 degree in a heating furnace and installed on the shaft for cooling. Install the bearing gland on the left side of the bearing box, then install the bearing and shaft components into the bearing box, lean against the left bearing gland, and measure the clearance between the drive end bearing gland and the bearing outer ring. The clearance for the za centrifugal pump is 0-0.42mm. If the bearings of the za centrifugal pump are used in pairs, install and use a locknut to lock the bearings until the outer rings of the two bearings can rotate relatively slightly to obtain an ideal clearance. 3. Assembly of mouth ring and impeller, centrifugal pump body When assembling mouth ring and impeller, centrifugal pump body, it is necessary to ensure that the periphery of mouth ring is evenly installed into the impeller or centrifugal pump body

















